A residential demolition plan is the written roadmap for taking a home down. It lists the parts of the building and the utilities to shut off. It also names the materials to test, the order things come apart and where the waste goes.

In Boise, it's also the backbone of what the city wants to see. A good one is short and fits your lot. The crew that will do the work should write it.

What is included in a residential demolition plan?

A solid write-up has six parts. It covers the site and the structure, utility shutoffs, testing for hazards, the order of work, debris, and protection for whatever stays.

All six come out of one walk-through, which is usually the first step demolition crews take on a job. The crew looks over the residential structure and everything around it. That same visit is where the price comes from, so the scope and the estimate should match line for line.

Existing conditions: what's there and what stays

The first section lists existing conditions. It identifies existing building elements: the foundation type, framing, roof, siding, porches, chimneys, any slab or basement, and any structural damage.

It also marks what stays, like a fence, a tree or a driveway you want to keep. The crew works on the agreed part of the property only.

A simple sketch shows the home, the property lines, overhead power lines and where machinery gets in and out.

Utility disconnections: gas, power, water and sewer

Utility shutoffs come before anything else. The gas and power companies shut off and pull their service at the meter. Water and sewer get capped where the city or sewer district wants them.

This step often sets the pace, because you're working around other people's schedules. Cities generally want the utilities handled before they issue a demolition permit, so check Boise's current regulations.

Heads up: Older lots in the North End and on the Bench can hide an old gas line or sewer line. Buried lines should be marked through 811 before any excavation starts.

Testing for hazardous materials first

Before anything comes down, an inspector checks for asbestos, and often for lead paint too.

In older homes, asbestos and other hazardous materials can turn up in siding, roofing, pipe wrap and textured ceilings. If a test comes back positive, a licensed abatement company handles the removal first. Only then can the rest of the work start.

Method and sequence: the order of tearing it down

This section lays out the step by step demolition order. It says how it comes down: by machine, by hand in tight spots, or both.

For a typical single-story home, this plan calls for a top-down order, called vertical demolition. It looks like this:

  1. A salvage pass pulls doors, windows, metal and good lumber to donate or recycle.
  2. The roof and upper framing come down into the footprint, away from the neighbors.
  3. Walls and floor framing follow.
  4. The foundation, slab and footings get broken out and hauled off for recycling or disposal.
  5. Low spots are filled, and the lot is graded.

A written order matters most when fire, rot or settling has already weakened the frame. Vertical demolition lets the crew take unsafe structures apart safely, one level at a time.

Debris: donated, recycled or hauled away

This section sorts materials before tearing anything out. Usable items get donated. Concrete and metal get recycled. The rest goes to a landfill.

How debris removal is set up moves the price. It also decides whether a roll-off dumpster sits on the site.

Good to know: A lot of what comes out of a home can be donated or recycled. Want something saved, like old brick or a solid front door? Say so before the walk-through ends.

Protecting neighbors, trees and driveways

This section covers safety: fencing around the work area, dust control, where equipment parks and how trees are kept safe.

If a big tree stays, this plan calls for a fence at its drip line before any equipment shows up.

Dust is a real issue in hot, dry Treasure Valley summers, so the work gets sprayed down as it comes apart. In winter, frozen ground makes digging out footings slower.

Heavy equipment can also crack paving you're keeping. If the driveway stays, the sketch marks where machines will and won't drive.

A full teardown example, section by section

Here's a general example, not a specific job.

A single-story home with a detached garage and a driveway

Picture a single-story home on a crawlspace. A detached garage sits on its own slab, and a poured driveway links both to the street.

The goal is clearing everything except the driveway apron at the curb and a big shade tree out back.

What each structure gets

StructureWhat it says
Main homeAsbestos survey first, plus any removal it calls for. Utilities off and capped. Salvage pass for doors, windows and metal. Roof and walls down into the footprint. Foundation out, crawlspace filled.
Detached garagePower feed confirmed dead. Overhead door and metal recycled. Slab broken out and recycled.
DrivewaySaw cut at the apron line. The rest broken out and recycled. No machines on the apron that stays.
Backyard treeFenced at the drip line. No equipment, piles or parking inside the fence.

Where it points to new construction

A good write-up ends where new construction starts. The lot is graded and filled, nothing is buried, and utilities are capped where the builder can find them.

If you're rebuilding, share the detailed demolition plan with your builder early. They may want a slab left, a sewer line kept or fill packed a certain way.

Template or contractor: who should write it?

A template is a fine checklist, but your contractor should write the detailed demolition plan. The professional demolition crew doing the work knows the order, the equipment and where every load is going.

If you're comparing demolition services, ask whether the crew that writes it is the same one doing the work.

What a free template gets right and misses

Templates get the categories right: utilities, hazards, order, cleanup and safety. What they can't tell you is anything about your lot.

They don't know about the power line over the driveway or the fence you share with the neighbor. They can't see the old slab under the back porch. Detailed planning comes from walking the property, not from a form.

Worth asking: Did the price come from someone walking the property? If not, it's an average cost, not your price.

How it connects to demolition permits in Boise

In Boise, the city's application covers a lot of the same ground. That can include a site plan, proof of utility disconnections and an asbestos survey. Check the city's current checklist for what your project needs.

Meridian, Eagle, Star, Kuna, Nampa, Caldwell and the rest of Canyon County have their own steps and rules. Check with whoever covers your address so your paperwork lines up.

Ask the crew whether the permit application and its compliance paperwork are handled as part of the project.

Tips: questions to ask before you sign off

A few questions to ask before you say yes:

  • Who's setting up the utility shutoffs?
  • Has the asbestos survey been done, and who has the report?
  • Where does the debris go, and what gets donated or recycled?
  • Is the price firm, and does it cover paperwork, hauling and disposal for the whole project?

Frequently asked questions

What is the process of demolition?

Most projects run in this order: walk-through, asbestos testing, utility shutoffs, city approval, salvage, teardown, hauling and grading.

What is the average price for house demolition?

There isn't a useful average cost for house demolition, because a number found online can't see your lot. The price comes down to size, foundation, access, hazards, disposal and paperwork, and a garage is a very different project from a whole home. Ask for a firm price after an on-site estimate, and confirm there are no hidden fees.

What are the two types of demolition?

The two types are total and selective demolition. Total demolition is when you demolish everything on the lot, usually down through the foundation, before a rebuild or a land sale. Selective demolition takes down one part of the property only, like a detached garage, a deck, a shed or a pool, while the home stays standing and protected.

How early should you start?

Get the scope in writing before you apply to the city, since the application draws on much of the same information. Utility shutoffs and asbestos results often set the pace of the demolition process, so start as soon as you know the home is coming down.

Getting started with planning

The best place to plan your demolition is a walk-through, not a phone quote. Get the scope, the order and the cleanup in writing before any work begins.

Related reading: Residential Demolition Specifications: What a House Teardown Spec Covers and Residential Demolition Notes: What They Say and Why They Matter.

Planning a teardown anywhere from Boise's North End to Nampa or Caldwell? Boise Demolition's residential demolition services start with a free walk-through. That visit is where the scope starts, and you get a firm price before anything is touched. Call (208) 296-6153 to talk through your project.

Planning a Demolition Project?

We handle permits as part of our demolition services throughout Boise, Meridian, Nampa, and the Treasure Valley. Call for a free estimate.

Call (208) 296-6153
Website byReview Monster - website design and digital marketing