
Residential Demolition Notes: What They Say and Why They Matter
Residential demolition notes are the written instructions on a demo drawing. They say what comes down and what stays. They also say how the utilities get shut off and how the lot should look when the crew leaves. If you're tearing down a house, garage or shed in Boise or the Treasure Valley, that wording decides what your estimate covers.
What are residential demolition notes on drawings?
They're short, numbered instructions. The drawing shows where things come out. The written part says how, what to protect and when the job counts as done.
They come in two kinds. General demolition notes apply to the whole job, like "protect all existing to remain" or "coordinate demolition with all trades." Demolition keynotes point at one spot with a number or symbol. A small hexagon with a 4 in it might point at a slab and read "remove slab and footings in full." Keynotes save room on a busy sheet.
The callouts usually sit down the side of the sheet or in a block near the title.
Ask for all drawings, not just the page with the house on it. The plot plan, the demolition sheets and any engineering pages can each change the job.
How do you read a PDF set?
Many demolition plans show up as a PDF now. You can zoom in on tiny callouts and search the PDF for words like "remove" or "protect." Start with the cover sheet. It often gives a quick overview of the job.
Keep all drawings in one PDF with a clear project name. Then every company offering demolition services prices the same version. If the set changes, send the new PDF to all of them.
Print the key pages and bring your questions to the estimate at the job site.
A renovation set may also include ceiling, roof and MEP demo sheets. Those belong to remodel work. On a full teardown, the pages that matter are the lot drawing and the teardown sheet.
What a teardown drawing shows
The drawing is usually set over a map of the lot at a set scale. The building coming out is dashed. Everything staying is solid. The written callouts fill in what the drawing can't show.
Utilities: who shuts off and caps each one?
Utility callouts say which utilities get cut off and where they get capped. They also say who handles each one. That means power, gas, water, sewer and sometimes irrigation.
A typical one reads "Owner to arrange shutoff of all utilities before work starts. Cap sewer at the lot edge." The power and gas companies usually pull their own meters and set that schedule. Good demolition plans name a person for each call.
Heads up: Some drawings say "utilities to be shut off by others" and name no one. That can stall a job on day one. Assign each call to a person before you pick a start date.
What stays: trees, fences, driveways and neighbors
"Existing to remain" callouts list everything on the lot that has to survive the work. Trees, fences, sidewalks, driveways, retaining walls and the neighbor's garage all show up here.
On older lots in the North End or on the Bench, big tree roots can run under the house. A good tree callout says how far out the fencing goes. It also says if machines can drive inside it.
If the drawing shows something solid and says nothing about it, assume it stays. Then ask.
What comes out: the house, foundation, slab and flatwork
This is the core of the demolition scope. "Remove house" sounds clear. But does it cover the foundation, basement walls, garage slab, patio and front walk?
Foundation and slab removal is often where estimates swing. Concrete is heavy and hauls separately. Footings can also go deeper than anyone expects. "Remove all foundations, footings and slabs in full" is a very different job from "remove structure to top of foundation."
Driveway and patio removal is often listed on its own. If it isn't on the drawing, ask whether it's in the price.
Good to know: If you're rebuilding, your builder may want part of the old foundation left, or all of it gone. Get that answer from your design professionals before the demo plans are final.
How the lot is left: backfill, grading and cleanup
These callouts set the finish line. They say if a basement gets backfilled and with what fill. They also say how it's packed down and how the lot gets graded.
A common one reads "Backfill all digs with clean fill, compact and rough grade to drain away from nearby buildings." Some drawings stop at rough grade because a builder is coming next. Others want a finished, level lot. Get it in writing.
Salvage, donation and recycling
Salvage callouts list anything the owner wants to keep. They also list materials to pull for reuse or recycling. Old brick, timbers, doors or a cast iron tub might come out first.
A lot of teardown debris can be donated or recycled instead of buried. Concrete and metal are two of the easiest things to keep out of the landfill.
A starting template for a house demolition
A template is a starting list of general instructions most drawings share. On a construction project with a rebuild, architects and engineers adjust them.
Wording that protects people and property
Common ones:
- Contractor shall check all conditions before starting work.
- Coordinate demolition with all trades and utility companies.
- Protect trees, fences and nearby buildings.
- Keep the lot secured when no one is working.
- Control dust and keep debris off public streets.
- Temporary shoring shall be designed by an engineer. Calculations must be signed before use.
That last item belongs with the structural notes. It shows up when a retaining wall or a wall near a neighbor has to stay standing. If calculations must be signed, ask who hires the engineer.
Wording that defines the scope
Scope callouts say what's in and what's out. They might read "Remove all elements shown dashed" or "All any demolition not shown shall be confirmed with owner first." That clumsy wording means every bit of work, drawn or not. Ask what it covers before you sign.
Some drawings add that any change to the exterior elevation requires prior planning approval. You may see it when only part of a home changes, like taking off a carport or deck in a historic neighborhood. If yours says that, call your city's planning office before you book.
Worth asking: Ask your contractor to walk the drawing with you. Have them point at each callout that affects the price. Any company that offers demolition services should explain every one. If they can't, it probably isn't in their number.
Wording that sets the finish line
These cover debris removal. Residential drawings also add backfill, grading, erosion control and final cleanup. They often include "Haul all debris to an approved facility" and "Leave the lot safe and level."
Frequently asked questions
Do I need a full set of demo plans to tear down a house or garage?
Often not. For many teardowns, a simpler drawing of the building, the utilities and what stays may be enough. Some offices accept a PDF upload. Rules vary by city and county, so check with yours.
Who writes them, me or a professional contractor?
On a bigger build or a renovation, an architect, engineer or designer usually writes them. On a simple teardown, a professional contractor can help you put the scope in writing for the permit.
What does "existing to remain" mean on a drawing?
It means the item has to be protected and left in place. If it gets damaged during the work, the contract usually says who's on the hook to fix it.
Do they cover asbestos or other hazards?
They usually mention it with a line like "asbestos survey and abatement by others." Older homes may need a survey before a permit is issued. Licensed specialists handle any abatement before demolition. Residential or not, ask your city what's required.
Check the project wording before you get a price
Check the written part for utilities, what stays, what comes out, how the lot gets left and what gets saved. Then you'll know whether two estimates price the same demolition plans.
A few things move the price of a teardown up or down:
- How much concrete comes out and how deep the footings go
- Whether a basement needs backfill
- How easily machines and trucks can reach the job site
- How many trees, fences and walls need protection
- Whether asbestos work has to happen first
- What your city wants for the permit
Related reading: Residential Demolition Specifications: What a House Teardown Spec Covers and Residential Demolition Costs: What Really Sets the Price on a Teardown.
Related reading: Residential Demolition Specifications: What a House Teardown Spec Covers and Residential Demolition Costs: What Really Sets the Price on a Teardown.
Planning a house demolition in Boise, Meridian, Nampa or anywhere else in the Treasure Valley? Our Residential Demolition Services page explains how the work goes. Boise Demolition does free estimates in person. You get a firm price before anything is touched, and we can handle the permit application too. Have your drawings or the PDF handy when you call (208) 296-6153.
Planning a Demolition Project?
We handle permits as part of our demolition services throughout Boise, Meridian, Nampa, and the Treasure Valley. Call for a free estimate.
Call (208) 296-6153More From Our Blog
Demolition Labor Cost per Hour vs. Total Demolition Cost on a Teardown
Demolition labor cost per hour tells you little about a teardown. Learn what really drives house demolition costs and why crews price by the job.
Demolishing a Garage: How It Comes Down, Slab and All
Demolishing a garage, step by step: utilities and permits, attached vs. detached, block walls, slab removal and when an old roof needs asbestos testing.
Do I Need a Permit for Building Demolition? Who Handles What
Do I need a permit for building demolition? Usually, yes. Here's what comes before the application, who handles each step and what moves the cost.